DRI — Decision Reliability Infrastructure

DRI measures and proves the reliability of a quantum-derived decision before you act on it. It answers: “Is this optimisation answer safe to act on, given noise, drift, and problem shifts?” It probes a solution against perturbations of the problem, produces a Decision Reliability Rating with a traffic-light semaphore, and seals the evidence so the rating can be audited later.

Run individual probes

Probes perturb the problem and re-evaluate the solution (synchronous):
The response reports num_probes, num_successful, success_rate, and per-probe results.

Run a full DRI rating

Response fields:
  • rating_id, score — the Decision Reliability Rating
  • semaphore, is_safe, needs_review — the go / no-go picture
  • top_driver, critical_actions — what most threatens the decision and what to do about it
  • evidence_bundle_id — the sealed evidence behind the rating

Institutional Proof Tests (proof-of-quantum)

For formal decision validation, run the full probe battery with a decision context and hypothesis:
The proof test produces the Decision Robustness Rating (DRR), a cryptographically sealed evidence bundle, and PDF-ready report data.

Compare two proofs (drift detection)


Download certificate PDFs


List ratings and fetch reports


Reading the rating